BF70017, Teepee Creek AB
Bridge culvert replacement
Project Value: $900,000
Client: Alberta Transportation (AT)
Duration: April 2019 to June 2019
Supervisor: Mark Rae, Glen Melanson
Scope:
Construct 9m wide detour road
Re-align existing culvert for water diversion
Remove existing culvert, replace with 43m of 2.2m dia SPCSP
Install concrete end treatment and rip rap
Reinstate highway
Bridge File 70017
Teepee Creek, AB
Mewata Armoury
Calgary, AB
Mewata Armoury, Calgary AB
Retaining Wall & Parking Lot rehabilitation
Project Value: $1,000,000
Client: Department of National Defense (DND)
Duration: August 2018 to September 2018
Supervisor: Matt Reckord
Scope:
Demolish existing fencing, pavement, and retaining wall.
Excavate and haul away contaminated materials.
Supply and install new retaining wall. Backfill, compact, pave parking lot.
Installation of new CCTV system, security gate, fencing, and hand rails.
Elkford Watermain, Elkford BC
installation of watermain and 6 prvs
Project Value: $1,100,000
Client: District of Sparwood
Duration: July 2018 to November 2018
Supervisor: Mark Rae
Scope:
Supply and installation of 800 meters of 12” PVC water main
Installation of 6 PRV stations, complete with programming and commissioning
District of Elkford
Elkford, BC
RCMP Dog Training Facility
Innisfail, AB
RCMP Dog Training Facility, Innisfail AB
repaving, Landscaping, and various siteworks
Project Value: $1,150,000
Client: Royal Canadian Mounted Police (RCMP)
Duration: July 2018 to September 2018
Supervisor: Glen Melanson
Scope:
Road coring and base preparation, total of 8,500 square meters
Subcontracted paving of 8,500 square meters
Site regarding 10,000 square meters; supply and install of trees, light posts, etc.
CFB 4-Wing Base, Cold Lake AB
airfield drainage repairs
Project Value: $1,750,000
Client: Department of National Defense (DND)
Duration: September 2017 to January 2018
Supervisor: Glen Melanson, Mark Rae, Paul Dyck
Scope:
Installation of over 4km of corrugated steel storm pipe
20,000 square meters of hydroseeding
CFB 4-Wing Base
Cold Lake, AB
Ferry Landing
Balfour, BC
Highway 3A, Balfour BC
watermain installation
Project Value: $1,300,000
Client: Regional District of Central Kootenay (RDCK)
Duration: March 2018 to October 2018
Supervisor: Glen Melanson
Scope:
Supply and installation of 1,300 meters of 8” PVC water main
8 Watermain tie-ins to existing infrastructure
2 Highway crossings
25th Street, Cold Lake AB
water loop installation
Project Value: $600,000
Client: City of Cold Lake
Duration: July 2017 to September 2017
Supervisor: Glen Melanson
Scope:
Supply and installation of 1,100 meters of 12” PVC water main
Supply and installation of 5 underground isolation valves
10,000 square meters of hydroseeding and finishing
City of Cold Lake
Cold Lake, AB
CFB Suffield
Ralston, AB
CFB Suffield, Ralston AB
upgrade sewer services (2018)
Project Value: $180,000
Client: Department of National Defense (DND)
Duration: July 2018 to August 2018
Supervisor: Paul Dyck
Scope:
Supply and installation of 8 sewer services to residential housing
Remedial landscaping work
Remedial paving work
CFB Suffield, Ralston AB
upgrade sewer services (2017)
Project Value: $175,000
Client: Department of National Defense (DND)
Duration: July 2017 to August 2017
Supervisor: Glen Melanson
Scope:
Supply and installation of multiple sewer services
Remedial landscaping work
Remedial paving work
CFB Suffield
Ralston, AB
CFB Wainwright
Denwood, AB
CFB Wainwright, Denwood AB
Water main valve repairs
Project Value: $210,000
Client: Department of National Defense (DND)
Duration: November 2017 to January 2018
Supervisor: Mark Rae
Scope:
Supply and installation of 15 water main isolation valves
Extensive water system trouble shooting
Remedial paving work
Remedial landscaping work
BF 73448 - High Level AB
install new 4.0m spcsp over Highway 35, 40 km north of high level
Project Value: 1,600,000
Client: Alberta Transportation
Duration: July 2019 to October 2019
Supervisor: Mark Rae, Glen Melanson
Scope:
construct 120m x 10m detour road
remove existing culvert; replace with 4.0m spcsp
install concrete end treatment
reinstate highway
depth of excavation 10m